National Parks
Mt. Ashibetsu Dake |
 |
|
1726.5m
Trekking to Mt. Ashibetsu Dake begins at Taiyo no Sato Park in Yamabe. There are two routes, Kyu-dou and Shin-dou. Shin-dou takes you 4hrs and 20min.to climb up and 3hrs to walk down. Both routes are suitable for intermediate climbers. Please try Kyu-dou and tell us how long it took. |

Mt.Furano-Nishidake |
 |
|
1331.1m
There are two routes, Kyu-dou and Furano Ski Hill Course. Kyu-do takes 3 and a half hours (3 hrs down) and starts from the small Hahako–do Shrine near Goryou Line Gosen bus stop. Furano Ski Hill Course takes you 3 and half hours (2 and half hours down) and overlooks the Furano Basin and Mt. Tokachidake. |

Mt. Furanodake and Genshigahara Wetlands |
 |
|
1912.1m
You can climb up Mt. Furano dake enjoying trekking through spectacular scenery.
Genshigahara Wetlands has two routes the 5hrs and 20min. (3hrs and 50min. down) and the Taki /Waterfall Course a 4 and a half hour trekking Rinkan /Forest Course. |

Mt.Tokachidake |
 |
|
2077m
The trekking starting point for Mt. Tokachi dake is located 1270m above sea level from the top of the road beside the Ryounkaku Onsen. The conditions at the top of the mountain can tend to be unpredictable and harsh. Please prepare proper gear. This course starts from the Tokachidake Onsen area. |
Back to Parks & Nature page |
|
|